Basic Description
Outfitted with all the zero leak bidirectional checking sole-noid valves, this power unit is developed for your operation of two independent circuits. Which are respectively for the primary and subordinate platforms from the double scissors lift. Two cut-off valves are utilised for reducing the machine manually in situation of energy loss. If much more independent circuits are needed to your application please make contact with us for availability.
Remark: one. Please talk to our product sales engineer to the distinctive pump displacement, motor electrical power or tank capacity.
two. CSA or UL certified motors are available on request.
Distinctive Notes
1. The AC motor is of S3 duty cycle, which might only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all the hydraulic elements concerned in advance of installation of the electrical power unit.
three. Viscosity of your oil shoud be 15~46 cst,along with the oil should be clean and absolutely free of impurities,N46 hydraulic oil is proposed.
4. The electrical power unit ought to be mounted vertically.
five. Check the oil degree during the tank just after the initial operating on the power unit.
6. Oil shifting is needed following the preliminary 100 operation hrs,afterwards after every single 3000 hrs.