Owing to our sincerity in offering best services to our consumers, knowing of your requirements and overriding sense of duty towards filling ordering requirements, A lot more importantly, we make specific elements in accordance to supplied drawings/samples and warmly welcome OEM inquiries. Innovative thermo remedy products, these kinds of as community heat treatment oven, multi-use thermo therapy oven, etc.

Product Description:

A grooved pipe elbow is utilized to connect pipe bends and alter the path
of a pipeline system.

EPT Ductile forged iron conforming to ASTM A-536, Grade sixty five-forty five-twelve
Surface Remedy Epoxy powEPTTcoating (Pink shade- RAL3000 Orange)Optional: Galvanized (Zinc Plated, EPTTG Or DIP painted)
Size one quot-12 quot
Operating Pressure 300PSI
Cerification ISO 9001: 2008, FM, UL, CCC and CE accepted
EPT Stop Type Grooved finish, Thread stop
EPTT EPTT
Payment By T/T, L/C
Structure kind 1) Rigid Coupling, FleXiHu (West EPT) Dis.ble Coupling, Minimizing FleXiHu (West EPT) Dis.ble Coupling
2) EPTT Radius and Short Radius Elbow (90 deg/45 deg/22.five deg/11.twenty five deg)
three) Equal Tee, Grooved Minimizing Tee, Grooved Reduing Tee(Threaded outlet)
4) Grooved EPT Tee, Grooved EPT Cross
five) Equivalent Cross, Grooved Minimizing Cross
6) Grooved EPTT, Threaded EPTT
seven) Adapter Flange, Grooved SpEPTT Flange
eight) Cap, Conclude Cap

Merchandise Process

EPTT Info

JiXiHu (West EPT) Dis.ang EPTT Manufacturing facility has a complete established of casting, machining, coating, rubber, screening and other manufacturing and high quality screening technique. The major items of EPT are grooved pipe fittings and components, from the JCEP States, merged with the genuine, in rigorous accordance with the ISO9001 worldwide quality management technique to organize manufacturing, the merchandise have passed the nationwide set EPT extinguishing and EPT supervision and inspection cEPTTr, the mechanical part of EPTT goods screening cEPTTr and a number of authoritative section screening and certification, all in accordance with the nationwide stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd GB5135.

Our Certification

EPTT and Shipment

FAQ

Q: Are you buying and selling organization or producer?
A: We are a factory.
Q: How EPTT is your supply time?
A: EPTTly fifteen daEPTTafter the down payment. OEM 30 to 90 days.
Q: Do you offer samples? Is it free of charge or added?
A: Indeed, we could offer the sample for cost-free cost but do not pay the EPT of freight.
Q: What is your conditions of payment?
A: Payment lt=1000USD, 100% in EPT.
Payment gt=1000USD, thirty% T/T in EPT ,stability just before shippment.
If you have an additional issue, pls feel totally free to make contact with us.

Get in touch with Us

Ms. Coco
OverEPTT Advertising and marketing Supervisor